The production complex was commissioned in 2003. Suitable for FVS (Food and
Veterinary Service) needs, historically a meat processing company.
• Gas, urban sewerage. Local borehole. Gas heating/ Clayton steam generator
SE-204.
• The production building, office and engineering buildings are interconnected and
can be used as a single complex.
• The property also contains two ancillary buildings – a pass building and a car
wash building; as well as a civil engineering structure – water reservour.
• Before entering the feenced territory, there is a parking lot for employees and
guests for about 30 - 40 cars.
• If neccessary the floor plan of production part will be sent seperatly in PDF format
(enlargable).
Lit. 001 – Production Building/ sq.m 2 717,5
Lit. 002 – Office Building/ sq.m 699,5
Lit. 003 – Engineering Building/ sq.m 300,4
Lit. 004 – Pass Building/ sq.m 12,8
Lit. 005 – Car wash/ sq.m 127,6
Water Resevour.